copyright 2026 All Rights ReservedGuangke (Shanghai) Industrial Automation Technology Co., Ltd. XML
Applicable scenarios Lithium battery factories, photovoltaic module factories, hydrogen energy equipment manufacturing, and new energy vehicle powertrain factories adapt to the needs of different scales such as pilot lines, mass production lines, and whole plant projects.
Product introduction
Relying on Guangke Industrial's more than ten years of non-standard integration technology in thermal management, it has developed a complete set of automated assembly and testing production lines for lithium battery PACK, photovoltaic energy storage liquid cooling modules, and energy storage battery packs. Integrated AGV intelligent material distribution, pallet RFID traceability, intelligent tightening, high-voltage safety regulations, airtight leak detection, aging test integrated solution, supporting MES manufacturing execution system, real-time data visualization dashboard, covering battery module assembly, liquid cooling pipeline integration, battery pack off-line EOL full inspection process, suitable for household energy storage, industrial and commercial energy storage, and intelligent manufacturing of vehicle power battery thermal management components.
Core Advantages Highlights
Exclusive process library for energy storage thermal management | Precipitation vehicle + energy storage dual liquid cooling assembly and testing process eliminates the need for customers to repeat process development; |
AGV multi-vehicle intelligent dispatching system | SLAM autonomous navigation, dynamic obstacle avoidance, automatic docking of loading and unloading stations on the production line, reducing manual transfer; |
High voltage safety interlock protection | The high-voltage test area is fully enclosed with safety fences, door interlocks, emergency stops, and leakage protection for multiple protections; |
Full-link material traceability | All battery cells, liquid cooling valves, and plate replacement parts are bundled in batches to fully support after-sales traceability of energy storage equipment; |
MES deep integration package | Equipped with self-developed MES system, integrated management and control of equipment operation, work orders, quality, and maintenance data; |
Flexible modular design | Quickly switch production procedures for household small energy storage and industrial and commercial large energy storage battery packs |
Core system parameter table
Parameter items | Technical indicators |
Adapted products | Vehicle power battery PACK, household/industrial and commercial energy storage liquid cooling module, photovoltaic energy storage inverter water cooling module |
Standard beat (household energy storage) | 240s/unit; industrial and commercial energy storage 800s/unit |
control system | Siemens S7-1511/1516 series PLC, 19-inch industrial HMI |
AGV dispatching capability | Cooperative dispatching of up to 16 AGVs, SLAM trackless navigation |
High voltage detection voltage | DC 300~1500V, insulation withstand voltage 3kV |
Airtight leak detection accuracy | Dry type 1×10⁻⁴ mbar・L/s, hydrogen detection 1×10⁻⁶ mbar・L/s |
Traceability | RFID metal pallet + parts QR code dual traceability |
MES supporting functions | Work order management, equipment monitoring, material traceability, quality reports, maintenance warnings |
Production line environment adaptation | Anti-static workshop standard, temperature and humidity 20±5℃, humidity 40%-70% |
Detailed explanation of core functions and values
Automatic assembly of battery module liquid cooling system | AGV automatically distributes battery cells, liquid cooling plates, multi-way valves, and pipeline components. The robot completes module stacking, liquid cooling pipeline docking, gasket press installation, and multi-axis synchronous intelligent tightening; the servo closed-loop controls the tightening torque to prevent pipeline sealing failure and battery core extrusion and deformation. |
Visual appearance and assembly defect detection | Industrial vision scans liquid cooling pipeline assembly misalignments, damaged wire harnesses, bumps on the cell surface, and missing seals. AI algorithms automatically classify defects, automatically divert and isolate defective products, and simultaneously retain defect image files. |
Battery pack EOL offline full performance testing | Integrated high-voltage insulation withstand voltage, leakage current, liquid-cooling loop airtight leak detection, BMS communication simulation, full-load aging test, simulates the full working conditions of energy storage charge and discharge, verifies the stability of liquid cooling and heat dissipation, and high-voltage electronic control system, and intercepts potential safety hazards of leakage, coolant leakage, and communication failure in advance. |
AGV intelligent workshop material flow | The SLAM trackless navigation AGV automatically undertakes raw materials, transfers semi-finished products, and transports finished products. It intelligently allocates tasks to multiple vehicles, supports priority work order scheduling, and automatically connects with the production line and unloading workstations, reducing manual forklift transfers, material collision losses, and workshop operation labor costs. |
Supporting services and delivery guarantee
1. Early stage: joint research and development of energy storage product technology, workshop AGV logistics simulation planning, and anti-static production line layout design;
2. Delivery time: 90 working days for standard household energy storage production lines, 120 working days for large industrial and commercial energy storage customized production lines;
3. Implementation: full-load trial operation of energy storage samples in the factory → special packaging and logistics for anti-static equipment → on-site AGV, high-voltage testing, and MES system joint debugging → 7-day continuous full-load acceptance;
4. Training: full training on AGV scheduling and operation and maintenance, high-voltage detection safety operation, MES system report editing, and robot teaching;
5. After-sales: 1-year warranty for the whole machine, 2-year warranty for PLC, high-voltage detection unit, and AGV robot; 4-hour written response, 24-hour nationwide engineers on-site; lifetime MES system free small version iterations, and spare parts supply at cost prices.