copyright 2026 All Rights ReservedGuangke (Shanghai) Industrial Automation Technology Co., Ltd. XML
Yinlun Valve Module Automated Assembly Line Project Case
2026-10-13
Yinlun Co., Ltd. is a leading company in the domestic thermal management industry. With the rapid expansion of its new energy vehicle business, the order volume of valve modules continues to grow. The original production line is mainly manual assembly, and the production capacity and quality stability can no longer meet the needs of business growth. At the same time, the requirements for the control of special characteristics of vehicle-grade CC/SC are constantly increasing, and there is an urgent need to upgrade the automated production line to achieve production capacity ramping, quality control, and full-process traceability.
Songzhi HVAC Assembly Test Line Project Case
2026-10-13
Songzhi Co., Ltd. is a leading domestic company in the field of commercial vehicle and passenger car air-conditioning. As the iteration of new energy heat pump air-conditioning products accelerates, the original air-conditioning assembly line is insufficiently automated and relies on manual inspection. It is difficult to meet the increasing vehicle-level quality standards and production capacity needs. There is an urgent need to build a fully automatic HVAC assembly assembly and testing line suitable for multiple models of products.
Sanhua Intelligent Water Control Integrated Module Assembly Line Project Case
2026-10-13
Sanhua Intelligent Control is a global leader in thermal management components. As the trend of thermal management integration in new energy vehicles accelerates, the complexity of water integrated module products continues to increase, integrating valve groups, pipelines, heat exchangers, sensors and other types of components. The original semi-automated production lines are no longer able to meet the requirements for high-precision assembly and high-reliability sealing, and there is an urgent need to upgrade dedicated automated assembly lines.
Front And Rear Air-Conditioning Assembly Complete Line Project Case Of Leading Car Company
2026-10-13
This customer is a leading independent brand car company in China. With the rapid increase in sales of new energy models, the production capacity and automation level of its own air-conditioning assembly production line can no longer match the vehicle production capacity plan. At the same time, the OEM has extremely strict requirements on the consistency, traceability and reliability of parts. It is urgent to build a high-standard, high-stability fully automatic production line for front and rear air-conditioning assemblies.
Well-Known Thermal Management Company's Plate Heat Exchanger Stacking Line Project Case
2026-10-13
This customer is a domestic professional plate heat exchanger manufacturing enterprise, and its products are widely used in the fields of automotive thermal management and energy storage temperature control. As orders grow, the original plate stacking process relies on manual operations, with low efficiency, unstable accuracy, and large yield fluctuations. It has become a production bottleneck, and there is an urgent need to upgrade automated stacking equipment.
Case Study Of Complete Line Assembly Project Of Liquid Cooling Unit Of Leading Energy Storage Enterprise
2026-10-13
Juneng Technology is an energy storage system integration company. With the explosive growth of large storage and industrial and commercial energy storage orders, the production capacity gap of liquid cooling units continues to expand. The original semi-automated production line has scattered processes and relies on manual inspection links, which cannot meet the high safety, high traceability, and high-tempo production requirements of the energy storage industry. There is an urgent need to build a new high-standard fully automatic line to support the rapid expansion of the business.