copyright 2026 All Rights ReservedGuangke (Shanghai) Industrial Automation Technology Co., Ltd. XML
Applicable products Integrated module assembly of radiator, condenser, cooling fan and windshield Core process flow Radiator/condenser loading → Wind shield and fan assembly → Temperature sensor installation → Pipe joint press installation → Air tightness test → Fan power performance test → Finished product off the production line
Product introduction
The vehicle front-end cooling integrated module fully automatic assembly line covers the entire process of condenser, cooling pipeline, electronic fan bracket, cooling fan assembly assembly, intelligent tightening, visual appearance inspection, fan power-on durability, and waterway air-tight leak detection. It adopts Siemens S7-1500 PLC centralized control and ring pallet RFID Traceability, modular work station design, compatible with batch automated manufacturing of front-end cooling modules for passenger cars and commercial vehicles, and can be used in conjunction with the vehicle air-conditioning assembly line.
Core Advantages Highlights
Fan durability online test under all working conditions | High and low voltage cycle operation, monitoring noise, current, and speed fluctuations; |
Flexible compatibility with multiple specifications of fans | Cooling fans of different sizes are assembled on the same line, and the replacement program can be switched with one click; |
Pipeline synchronous leak detection unit | The air tightness of the condenser pipeline is directly tested after assembly to prevent refrigerant leakage; |
Servo tightening torque graded control | Different torque thresholds are distinguished for brackets and pipe joints to accurately control the assembly process; |
Multi-device collaborative communication | Robots, tightening spindles, leak detectors, vision equipment Profinet high-speed synchronization; |
Automatic fault diversion and sorting | Abnormal fan current and defective products with pipeline leakage are automatically diverted to the repair area. |
Core system parameter table
Parameter items | Technical indicators |
Adapted products | Passenger car/commercial vehicle front-end condenser + electronic fan integrated module |
standard beat | 210s/piece |
control system | Siemens S7-1500 PLC, 15-inch industrial HMI |
Tightening torque range | 1~30N・m, accuracy ±2% |
Fan test voltage | 12V/24V dual specifications compatible, current accuracy ±0.05A |
Airtight leak detection accuracy | ≤4×10⁻⁴ mbar·L/s |
Traceability carrier | RFID metal tray, resistant to oil stains and high temperatures |
Production line area | 50m×4m |
Communication speed | Profinet 100Mbps, multi-station synchronization without delay |
Detailed explanation of core functions and values
Integrated assembly of cooling module | The robot automatically grabs the condenser, fan bracket, and electronic fan, accurately aligns the servo positioning tooling, tightens the bracket bolts and pipe joints synchronously on multiple axes, and records the assembly torque of each location in real time. Tightening leaks and torque deviations will automatically alarm and shut down. |
Visual appearance defect detection | Industrial vision detects condenser fin deformation, pipe bumps, fan blade damage, and missing wire harness buckles, automatically marks defect types, and simultaneously stores image files for quality review. |
Electronic fan durability performance test | Simulate the high and low voltage power supply fluctuations of the vehicle, run the fan in full-load cycles, collect speed, operating current, and operating noise, and identify potential faults such as bearing wear, coil short circuit, poor dynamic balance, etc., to avoid abnormal noise and burnout of the fan while the vehicle is running. |
Condenser pipeline air tightness leak detection | Perform pressurized dry vacuum leak detection on refrigerant pipelines, detect micro-leakage in pipeline joints and condenser welds, and eliminate the problems of vehicle air conditioning refrigerant leakage and refrigeration failure from the source. |
Full-link digital traceability management | Each cooling module is bound to the pallet RFID, and the assembly torque, fan electrical performance, and leakage detection data are simultaneously uploaded to the MES system to meet the full life cycle traceability audit requirements of the OEM parts. Commercial value: The factory defective rate of front-end cooling modules has been reduced by 90%. A single production line has replaced 7 assembly inspection personnel, saving more than 700,000 yuan in labor and after-sales claim costs every year. |
Supporting services and delivery guarantee
1. Early stage: heat dissipation module process simulation, torque curve verification, workshop production line layout planning;
2. Delivery time: 70 working days for standard complete line;
3. Implementation: full sample trial production in the factory → joint debugging of on-site robots, tightening and leak detection units → 72-hour continuous stable operation acceptance;
4. Training: robot teaching, torque parameter debugging, fan test program editing, MES data operation and maintenance;
5. After-sales: 1-year warranty for the entire machine, 2-year warranty for the robot and servo tightening unit; 24-hour door-to-door maintenance nationwide, and lifetime supply of sealing consumables and testing filters at affordable prices.